Answer:

which is the first option in the list of possible answers.
Step-by-step explanation:
Recall that the minimum of a parabola generated by a quadratic expression is at the vertex of the parabola, and the formula for the vertex of a quadratic of the general form:

is at 
For our case, where
we have:

And when x = 1, the value of "y" is:

Recall now that we can write the quadratic in what is called: "vertex form" using the coordinates
of the vertex as follows:

Then, for our case:

Then, for the quadratic equal to zero as requested in the problem, we have:

Answer:
Step-by-step explanation:
10c^3 * c^4 = 10c^7
When two numbers raised to a power are multiplied, their exponents are added
Answer:7
Step-by-step explanation:
Answer:
2.4 hours
Step-by-step explanation:
Let total work = X
Rate of work done = X ÷ time
Rate of A = X/4
Rate of B = X/6
If they work together, rate is the sum of their individual rates, i.e.
X/4 + X/6
= (3X + 2X)/12 (taking LCM)
=5X/12
Rate = X/time
5X/12 = X/time
time = X÷(5X/12)
time = X × 12/(5X)
time = 2.4 hours
Shortcut:
Product of individual times/sum of individual times
= (4×6)/(4+6)
=24/10
=2.4 hours