Answer:
It will cost $39,337.92 for the piller.
Step-by-step explanation:
Given that,
The diameter of the cylinder, d = 8 m
Height of the cylinder, h = 9 m
If concrete cost $87 per cubic meter, we need to find how much the concrete cost for the pillar.
The volume of the cylinder is given by :

Cost per cubic meter = $87
Cost for 452.16 m³ will be :
C = 452.16 × 87
C = $39,337.92
Hence, it will cost $39,337.92 for the piller.
Answer:
Base ten blocks can represent values such as 1, 10, 100, and 1000.
<span>A) -5u + 2x = 22
B) -u - 6x = -34
</span>Multiplying A) by 3
A) -15u +6x = 66
B) -u -6x = -34 Then adding the 2 equations:
-16u = 32
u = -2
x = 6
Answer:
A. )3(-3) - 2 = -11
B.) 3(1) - 2 = 1
C.) 3(5) - 2 = 13
Domain: -3, 1, 5
Range: -11, 1, 15
Input: -3, 1, 5
Output: -11, 1, 13
Function: Yes
Linear: Yes
{ (-3, -11) (1, 1) (5, 13) }
Step-by-step explanation:
A.)
- 3x - 2
- 3(-3) - 2 [3 x -3 = -9]
- -9 -2 = -11
B.)
- 3(1) - 2 [3 x 1 = 3 Duh]
- 3 - 2 = 1
C.)
- 3(5) - 2 [3x5 = 15]
2. 15 - 2 = 13