Answer:
288 × 60=17280 feet
Step-by-step explanation:
For this case we have the following equations:
2x - 3y = 1
2x + 3y = 2
When adding both equations we observe that:
Sentence 1: we have an equation of a variable, which in this case will be x. We can clear the value of x.
Sentence 2: Knowing the value of x, we can substitute in any equation and find the value of y.
Sentence 3: The value of x and y represents the point of intersection of both lines (x, y).
Answer:
I came up with -12
Step-by-step explanation:
8 workers = 6 days to complete
x workers = 4 days faster to complete
6/4=1.5 days faster
1.5 x 8 = 12 workers needed to complete the wall in fours days
Answer:
0.8413 = 84.13% probability that a bolt has a length greater than 2.96 cm.
Step-by-step explanation:
Normal Probability Distribution:
Problems of normal distributions can be solved using the z-score formula.
In a set with mean
and standard deviation
, the z-score of a measure X is given by:

The Z-score measures how many standard deviations the measure is from the mean. After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X, that is, the percentile of X. Subtracting 1 by the p-value, we get the probability that the value of the measure is greater than X.
Mean of 3 cm and a standard deviation of 0.04 cm.
This means that 
What is the probability that a bolt has a length greater than 2.96 cm?
This is 1 subtracted by the p-value of Z when X = 2.96. So



has a p-value of 0.1587.
1 - 0.1587 = 0.8413
0.8413 = 84.13% probability that a bolt has a length greater than 2.96 cm.