Answer:
$7.20
Step-by-step explanation:
20% is the same as 0.2 or 2/10, which simplifies to 1/5.
1/5*36=36/5=7.20
Or you could straight up to 20%*36=7.20
Answer:
option B
Step-by-step explanation:
This work is faster rate than grading 36 assignments in 30 minutes because :
25 ÷ 20 = 1.25
1.25 hw assignment per minute
36 ÷ 30 = 1.2
1.2 hw assignments per minute
Answer:
Unit of measure
Step-by-step explanation:
Unit of measure
When we construct any type of graph the unit of measure needs to be present, becuase the numbers without units are just numbers and with just the numbers we can't have physical interpretation of the situation.
For this reason is importatn to include the units of meausre with the plots since with that we have a point of reference for the variables used.
And satisfy the condition "A standard of measure for a physical quantity and is included as part of the x and y axes labels on a line graph."
=
------> because,
is same as 64x³ and
is same as 125
Using the formula:
, we get,
=
=
------>that's your answer!!