Answer:
76
Step-by-step explanation:
I made a chart to simplify it
1 | -8
2| -2
3| 4
4| 10
5| 16
6| 22
7| 28
8| 34
9| 40
10| 46
11| 52
12| 58
13| 64
14| 70
15| 76
Answer:
7
Step-by-step explanation:
SOLUTION:
16% of 44 = 44 × 16% OR 44 × 16 / 100 OR 44 × 0.16
16% of 44 = 7.04
16% of 44 = 7.0 ( rounded to the nearest tenth )
Hope this helps! :)
Have a lovely day! <3
Answer:
33 meters
51 meters
Step-by-step explanation:
84-18= 66
66/2= 33
33+18= 51
Check your answer:
51+33=84
The score which is assigned from 1 to 4 by the teacher to each student for the project and is most likely to be is 3 with 0.48 probability.
<h3>
What is probability distribution?</h3>
Probability distribution is the statistical model which represent all the achievable and similar values of a random variable that it can possess in a specified range.
A teacher assigns a score from 1 to 4 to each student project. the table below shows the probability distribution of the scores for a randomly selected student.
- Probability distribution score: 1, 2, 3, 4,
- x probability: p(x) 0.06, 0.20, 0.48, 0.26
In the above data, the height probability of selection is 0.48. This probability belongs to the score 3.
Thus, the score which is assigned from 1 to 4 by the teacher to each student for the project and is most likely to be is 3 with 0.48 probability.
Learn more about the probability distribution here;
brainly.com/question/26615262