Place it in front of the second digit hopefully that helps I'm sorry I'm really tired
5 roach motels per square yd
A = L * W
A = 7 * 4
A = 21 square yds
so if they set out 5 roach motels per square yd, then they need to set out :
5 * 21 = 105 roach motels <==
Answer:
x ≈ 14.5
Step-by-step explanation:
A = x²√(25+10√5)/4
A = 1.72a²
x² = A/1.72
= 363.27/1.72
≈ 211
x = √211
≈ 14.5
The speed for which Brian iron the shirts is given by:

Rewriting we have:


Then, for each minute, we have the amount of ironed shirt is:

Answer:
At this rate, Brian plans 10/162 of his shirt.
Answer:
y = -3x + 4
Step-by-step explanation:
y = 4, this is where your line intersects with the y axis.
x = 1 is where your line is on the x axis (you want to include the part of the line that hits a point straight on, not one that goes past it.) So when it lands on the corner of the grids like the 4 for the y axis does, that is the point you are going to use.
Rise/Run is then your equation, so since you go down 3 and over 1 (counting from your y axis point), your slope is -3/1 or -3.
Then goes your y axis, so the final equation is
y= -3x + 4
I hope this helped!