Answer:
the slope is 4 and the y-intercept is -7
Step-by-step explanation:
Answer:
Project A :
NPV : $703,888.64
IRR : 44.882%
Project B:
NPV : $5,241.26
IRR : 49.662%
Project B is more profitable
Step-by-step explanation:
The NPV gives the difference between the present value of cash inflow and cash outflow over a certain period of time.
The Internal rate of return is the discount rate which makes the NPV of an investment 0. It is used to estimate the potential return on an investment. Investments with higher IRR are said to be better than those with lower IRR value.
Using the net present value, (NPV) Calculator, the NPV for project A is : $703,888.64
The IRR of project A is : 44.882%
The NPV for Project B is : $5,241.26
The Internal rate of return (IRR) : 49.662%
From the Internal rate of return value obtained, we can conclude that, project B is more profitable as it has a higher IRR than project A.
By clearly looking at the sequence there are in Arithmetic Progression
So for finding which term is 2218 in that sequence
we have x_{n} = a+ (n-1)d
Here,
a=3
x_{n}=2218 & d=5(by looking at the sequence given)
by substituting those values we get our desired result
2218=3+(n-1)5
2218-3=(n-1)5
2215=(n-1)5
2215/5=n-1
453=n-1
n=454
so 454 term is 2218
Answer:
E and D
Step-by-step explanation:
The sample % of these two populations would be 100/size (of student body at each school) x 100 so this would compare the two student bodies preferences for the particular type of candy bar. However, the actual % of the whole student body at each school would be a factor also. If the high school only had 200 students then this would be 50% representative but if the middle school had say 500 students this would only be 20% representative so this would have to be taken into account too. It might be more representative to have the same % of the student bodies respectively for the sample.