Answer:
Step-by-step explanation:
-4,0 and -1,0
Answer:
The GCF for the variable part is ab².
GCF<em>Variable</em>=ab²
Multiply the GCF of the numerical part 5 and the GCF of the variable part ab².
5ab²
Step-by-step explanation:
Answer:
The answer is C.)
Step-by-step explanation:
I hope its help Please let me know.
<u>Answer:</u>
Cost of sand = £150
Cost of bricks = £157.5
Cost of cement = £134
Total cost = £441.50
<u>Step-by-step explanation:</u>
We are given that:
2 tonnes of sand is for £75.00 per tonne,
20 bags of cement are for £6.70 per bag,
350 bricks at 45p each,
So, 2 tonnes of sand at £75.00 per tonne = 2 * £75.00 = £150.00
20 bags of cement at £6.70 per bag = 20 * £6.70 = £134.00
350 bricks at 45p each = 350 * £0.45 = £157.50
Therefore, the total cost of all the materials = £150 + £134 + £157.5 = £441.50
Answer:
D; x -y = 22
3x + 2y = 246
Step-by-step explanation:
Let us have the bigger number as x and the smaller as y
The difference between the two is 22
Thus, we have it that;
x - y = 22
twice the smaller number; 2(y) added to thrice the larger 3(x) equals 246
3x + 2y = 246
So we have the two equations as;
x -y = 22
3x + 2y = 246