1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Mazyrski [523]
3 years ago
13

Solve for the following y: -6x +2y=8

Mathematics
2 answers:
frosja888 [35]3 years ago
3 0
-4/3+1/3y I hope thats right 
Nonamiya [84]3 years ago
3 0
Y = 3x+4 is the answer to the following.
You might be interested in
What is an equation in slope-intercept form of the line that passes through the points (−2, −2) and (1, 7)? A. y=13x−43
ddd [48]

Answer:

I Dont Know

Step-by-step explanation:

5 0
3 years ago
Read 2 more answers
What is the place value of the 3 in the number 40,328,960 ​
ANTONII [103]
300,000 or three hundred- thousand. :)
3 0
3 years ago
Whats is the distance between the ferris wheel and the merry-go-round? Ferris wheel on the coordinate plane is (-9,6) and the lo
Bezzdna [24]

Answer:

19 units

Step-by-step explanation:

use distance formula: d = \sqrt{(x_2-x_1)^{2}+(y_2+y_1)^{2}}

x₂ = 10

x₁ = -1

y₂ = 6

y₁ = 6

now plug in

\sqrt{(10-(-9))^{2}+(6-6)^{2}}\\= \sqrt{19^{2}+0^{2}\\}\\= \sqrt{361}\\= 19

8 0
3 years ago
In an effort to cut costs and improve profits, any US companies have been turning to outsourcing. In fact, according to Purchasi
My name is Ann [436]

Answer:

a) 0.06% probability that 338 or more companies outsourced some part of their manufacturing process in the past two or three years.

b) 90.15% probability that 285 or more companies outsourced some part of their manufacturing process in the past two or three years.

c) 0.23% probability that 48% or less of these companies outsourced some part of their manufacturing process in the past two or three years.

Step-by-step explanation:

For questions a and b, the normal approximation to the binomial is used, while for question c, the central limit theorem is used.

Binomial probability distribution

Probability of exactly x successes on n repeated trials, with p probability.

Can be approximated to a normal distribution, using the expected value and the standard deviation.

The expected value of the binomial distribution is:

E(X) = np

The standard deviation of the binomial distribution is:

\sqrt{V(X)} = \sqrt{np(1-p)}

Normal probability distribution

Problems of normally distributed distributions can be solved using the z-score formula.

In a set with mean \mu and standard deviation \sigma, the z-score of a measure X is given by:

Z = \frac{X - \mu}{\sigma}

The Z-score measures how many standard deviations the measure is from the mean. After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X, that is, the percentile of X. Subtracting 1 by the p-value, we get the probability that the value of the measure is greater than X.

When we are approximating a binomial distribution to a normal one, we have that \mu = E(X), \sigma = \sqrt{V(X)}.

Central Limit Theorem

The Central Limit Theorem establishes that, for a normally distributed random variable X, with mean \mu and standard deviation \sigma, the sampling distribution of the sample means with size n can be approximated to a normal distribution with mean \mu and standard deviation s = \frac{\sigma}{\sqrt{n}}.

For a skewed variable, the Central Limit Theorem can also be applied, as long as n is at least 30.

For a proportion p in a sample of size n, the sampling distribution of the sample proportion will be approximately normal with mean \mu = p and standard deviation s = \sqrt{\frac{p(1-p)}{n}}

54% of companies surveyed outsourced some part of their manufacturing process in the past two to three years.

This means that p = 0.54

555 of these companies are contacted.

This means that n = 555

Mean and standard deviation: Normal approximation to the binomial:

\mu = E(X) = np = 555*0.54 = 299.7

\sigma = \sqrt{V(X)} = \sqrt{np(1-p)} = \sqrt{555*0.54*0.46} = 11.74

a. What is the probability that 338 or more companies outsourced some part of their manufacturing process in the past two or three years?

Using continuity correction, this is P(X \geq 338 - 0.5) = P(X \geq 337.5), which is 1 subtracted by the p-value of Z when X = 337.5. So

Z = \frac{X - \mu}{\sigma}

Z = \frac{337.5 - 299.7}{11.74}

Z = 3.22

Z = 3.22 has a p-value of 0.9994.

1 - 0.9994 = 0.0006

0.0006*100% = 0.06%

0.06% probability that 338 or more companies outsourced some part of their manufacturing process in the past two or three years.

b. What is the probability that 285 or more companies outsourced some part of their manufacturing process in the past two or three years?

Using continuity correction, this is P(X \geq 285 - 0.5) = P(X \geq 284.5), which is 1 subtracted by the p-value of Z when X = 284.5. So

Z = \frac{X - \mu}{\sigma}

Z = \frac{284.5 - 299.7}{11.74}

Z = -1.29

Z = -1.29 has a p-value of 0.0985.

1 - 0.0985 = 0.9015

0.9015*100% = 90.15%

90.15% probability that 285 or more companies outsourced some part of their manufacturing process in the past two or three years.

c. What is the probability that 48% or less of these companies outsourced some part of their manufacturing process in the past two or three years?

Now we use the sampling distribution of the sample proportions, which have:

\mu = p = 0.54

s = \sqrt{\frac{0.54*0.46}{555}} = 0.0212

The probability is the p-value of Z when X = 0.48. So

Z = \frac{X - \mu}{\sigma}

By the Central Limit Theorem

Z = \frac{X - \mu}{s}

Z = \frac{0.48 - 0.54}{0.0212}

Z = -2.84

Z = -2.84 has a p-value of 0.0023.

0.0023*100% = 0.23%

0.23% probability that 48% or less of these companies outsourced some part of their manufacturing process in the past two or three years.

4 0
3 years ago
Graph the equation below
baherus [9]

Answer:

See picture.

In the picture I graphed (0,1) and then graphed (1,3).

I connected the points with a straight-edge.

Step-by-step explanation:

This question is asking us to use slope-intercept form of a line to answer it.

Slope-intercept form is y=mx+b where m is the slope and b is the y-intercept.

Your equation is y=2x+1 so our m=2 and b=1.

So our y-intercept is 1.  This is the first point we graph.

The slope is 2 or as a fraction 2/1. Recall that slope=rise/run.  So this tells us after we plot (0,1) we need to go up 2 units and right 1 unit to get one more point to graph.  This point will be (0+1,1+2) or just (1,3).

I will draw a graph also to show you this:

3 0
3 years ago
Other questions:
  • Help me please thank you :))
    14·1 answer
  • 1 7/8 + 2 1/2 x 1 1/5 -1/10
    7·2 answers
  • How to solve for x 15 + 8x = 45 + 6x
    14·2 answers
  • Show me working please.
    8·1 answer
  • CAN SOMEONE HELP ME ASP ITS IS DUE IN 10 MINUTES?!?!?
    5·2 answers
  • Find the value of x<br>​
    6·1 answer
  • Please help brainliesttt if right WITH EVIDENCE
    5·1 answer
  • If the school is located at (9, 16) and the bakery is located 5 units to the right. What is the ordered pair that would represen
    12·2 answers
  • Teresa says she stacks about 7 dishes by hand every minute.
    9·1 answer
  • URGENT please i need the answer for my math test i’m failing
    12·2 answers
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!