Answer:
The one that is on the bottom half and on the right side.
Step-by-step explanation:
(0,30) to (10,0)
Because the x value 0 represents the time in which the paint job started and ends in the value 10
While the y value 30 is the amount of paint he started with and ends with 0
Answer would be the second one
A U B = B
The answer is 8 1/4 hours
Answer:
A' ( 2, 4) and B' ( -4, 0)
Step-by-step explanation:
A ( -2, 4) and B( 4,0) reflected over the y-axis
A' ( 2, 4) and B' ( -4, 0)
the y-coordinate do not change and the x is opposite sign
(x,y) reflected over y-axis (-x, y)
Answer:
Answers are below
Step-by-step explanation:
Minimum: 2.50(1.01)^10 = $2.76
Maximum : 2.50(1.01)^20 = $3.05
If these answers are correct, please make me Brainliest!