1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
goldenfox [79]
3 years ago
8

A-3/4=1/8 what is the answer

Mathematics
1 answer:
Nana76 [90]3 years ago
3 0

Answer:

7/8

Step-by-step explanation:

a-3/4=1/8

make 3/4 into 6/8, they are the same, a-6/8=1/8 you add 6/8 to 1/8 and get 7/8

You might be interested in
a local University wanted 2300 students out of 4500 applications for admission where was the acceptance rate as a percentage​
EleoNora [17]
2300\4500*100=
51.11%
5 0
3 years ago
Select the functions that have a value of -1. sin270° cos270° tan270° csc270° sec270° cot270°
stealth61 [152]

sin 270° has the value of -1 sweety

5 0
2 years ago
A new patio will be an irregular hexagon. The patio will have two long parallel sides and an area of 360 square feet. The area o
irina [24]
The problem ask to calculate the corresponding distance on the new patio where as the the patio will have two long parallel side and an area of 360 square feet and the area of the similar patio is 250 square feet and its long parallel sides are 12.5 feet apart. To calculate this the ratio of the distance of the two polygon is P:Q so it means that the are is also P^2:Q^2 so the ratio of the area is  36:25 so the the distance of the new patio is 18 feet
5 0
3 years ago
Read 2 more answers
Hello guys, what is 2+2 equal to?
zloy xaker [14]
The answer is 4! lol
4 0
3 years ago
Read 2 more answers
Use a 95​% prediction interval to predict the useful life of a brand A cutting tool when the cutting speed is 45 meters per minu
qwelly [4]

Answer:

<em>The answer resides in the explanation.</em>

<em>Pls rate as brainliest </em>

Step-by-step explanation:

The predicted useful life of a brand A cutting tool when the speed is 45 meters per minute is 1.2 to 5.5 hours.

The predicted useful life of a brand B cutting tool when the speed is 45 meters per minute is 3.4 to 5.4 hours.

The prediction interval for brand A is larger than the prediction interval for brand B because the estimated standard error of  y^ is different for the two intervals.

The prediction intervals are both larger than the corresponding confidence intervals.

The standard error for the estimated mean value of y is smaller than the standard error for the predicted value of y.

The predicted useful life of a brand A cutting tool that is operated at 100  meters per minute is -0.59 hours

The actual predicted useful life of a brand A cutting tool when the speed is 100 meters per minute is 0.0 to 2.3 hours.

6 0
3 years ago
Other questions:
  • Please solve this: 0.45-0.05+0.2-0.5
    10·2 answers
  • What is ; 1.5×0.32 pls answer this asap​
    5·2 answers
  • Which of the following summarizes the end behavior of the function g(x) = 4x2 - x?
    12·1 answer
  • What is the measure of angle d
    11·1 answer
  • Suppose you are determining the growth rate of two species of plants. Species A is 12 cm tall and grows 2 cm per month. Species
    8·1 answer
  • C<br> 8 yd<br> 6 yd<br> What is the length of the hypotenuse?
    9·1 answer
  • The amount of fertilizer needed for a lawn varies directly with the area of the lawn Mr. Dundee lawn is a rectangular shape and
    12·1 answer
  • Hiii please help! i’ll give brainliest if you give a correct answer tysm!
    15·2 answers
  • 40 pnts and brainliest to best answer ( :
    6·2 answers
  • Mr.arswan prepares a mixture for a science experiment. He measures 10.5 grams of wood shavings,150 grams of iron filings, and 18
    5·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!