1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
tensa zangetsu [6.8K]
3 years ago
12

on Sunday 845 people went to zoo.on Monday 169 people went to zoo.What is the percent decrease in people visiting zoo on Monday?

Mathematics
1 answer:
Doss [256]3 years ago
6 0

( 845 - 169 ) ÷ 845 = 80%

You might be interested in
Sylvia placed 20 marbles in a bag: 10 red, 5 blue, green, 1 white. If
wel
The answer is 25 % hope it helps
6 0
3 years ago
Half-life of Po-210 is 140 days. If the initial mass of the sample is 5
Anna35 [415]

Answer:

0.625kg

Step-by-step explanation:

we are given half-life of PO-210 and the initial mass

we want to figure out the remaining mass <u>after</u><u> </u><u>4</u><u>2</u><u>0</u><u> </u><u>days</u><u> </u>

in order to solve so we can consider the half-life formula given by

\displaystyle f(t) = a {0.5}^{t/T}

where:

  • f(t) is the remaining quantity of a substance after time t has elapsed.
  • a is the initial quantity of this substance.
  • T is the half-life

since it halves every 140 days our T is 140 and t is 420. as the initial mass of the sample is 5 our a is 5

thus substitute:

\displaystyle f(420)=5\cdot{0.5}^{420/140}

reduce fraction:

\displaystyle f(420)=5\cdot{0.5}^{3}

By using calculator we acquire:

\displaystyle f(420)=0.625

hence, the remaining sample after 420 days is 0.625 kg

4 0
3 years ago
Please help -
USPshnik [31]

Answer: ok fine

Step-by-step explanation:

7 0
3 years ago
Read 2 more answers
Find b given that p(b,2) is equidistant from a(5,4) and b(2,5)
Oksana_A [137]
Hello : 
PA = PB  or  PA² = PB²
(5-b)²+(4-2)² = (2-b)² + (5-2)²
(5-b)²+4 = (2-b)² + 9
25 -10b +b² + 4  =  4 -4b+b² +9
-6b = -16 
b = 8/3

5 0
3 years ago
A construction crew is paving a road. The crew has already paved 1,000 square feet and can pave at a rate of 300 square feet of
denis23 [38]

Answer:

1,900 square feet; f(3) represents the total number of square feet the construction crew has paved after 3 hours.

The function of the construction crew is an illustration of a linear function

The value of f(3) is 1900, and f(3) represents the total number of square feet paved after working for 3 hours

The function is given as:

To calculate f(3), we substitute 3 for x

Multiply 300 and 3

Add 900 and 1000

This means that the value of f(3) is 1900.

And it represents the total number of square feet paved after working for 3 hours

1,900 square feet; f(3) represents the total number of square feet the construction crew has paved after 3 hours.

6 0
2 years ago
Other questions:
  • Write the rule for the nth term of the sequence. Then find a11-3.5, 3, 2.5, 2, 1.5, ...
    8·1 answer
  • Complete the division problem by determining the number that should be placed in the box.
    15·1 answer
  • What is 15/4 + -4 1/3
    14·1 answer
  • .Mai and Noah each leave their houses at ther same time and ride their bikes to the park. Using information
    12·1 answer
  • Can someone help me with integer? Thanks! ;D
    7·1 answer
  • Is (-1, -1) a solution of y = 3x + 2?​
    12·1 answer
  • A space vehicle has an independent backup system for one of its communication networks. The probability that either system will
    13·1 answer
  • What percent of 33.75 is 27?
    11·1 answer
  • If the average rectangular watermelon has a volume of 720 cubic inches, what’s the maximum number of watermelons you’ll be able
    15·2 answers
  • Find the value of x 2-x7=25
    8·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!