irga5000 [103]
3 years ago
10

If you run for 0.4 hours at 7 mph, how fast should you walk during the next 0.8 hours to have the average speed of 5 mph?

Mathematics
1 answer:
Fantom [35]3 years ago
4 0

Answer:

4 mph

Step-by-step explanation:

The average speed of an object is given by the total distance covered by the time taken:

v=\frac{d}{t}

where

d is the total distance covered

t is the time taken

in the first part, the person runs for 0.4 hours at a speed of 7 mph, so the distance covered in the 1st part is

d_1 = v_1 t_1 = (7)(0.4)=2.8 mi

Then the distance covered in the second part is d_2, so the total distance is

d=2.8+d_2 (1)

The total time elapsed is 0.4 hours (first part) + 0.8 hours (second part), so

t=0.4+0.8=1.2 h

So we can write the average speed as

v=\frac{2.8+d_2}{1.2} (1)

We want the average speed to be 5 mph,

v = 5 mph

Therefore we can rearrange eq.(1) to find d2:

d_2 = 1.2v-2.8 = (1.2)(5)-2.8=3.2 mi

And therefore, the speed in the second part must be

v_2=\frac{d_2}{t_2}=\frac{3.2}{0.8}=4 mph

You might be interested in
I have question in my Aleks website can you please help me with
Sati [7]

Answer:

5,3,5 range -1,6,2 domain

6 0
3 years ago
Which of the following is the best description for the formula below?
Karolina [17]
Compound interest sequence
5 0
3 years ago
There are four steps in the manufacturing process of a stuffed toy: cutting, stuffing, sealing, and packaging. There are two emp
Anit [1.1K]

Answer:

(a) 2min/15units

(b) 1min/20units

(c) The bottleneck stage is cutting. The process capacity is 450units/hour

(d) The capacity of the new employee should be 1unit/2sec. The process capacity will increase four times

Step-by-step explanation:

(a) Cycle time for stage cutting for 2 employees = 16sec/2units × 1min/60sec = 2min/15units

(b) Cycle time for stage sealing for 1 employee = 3sec/1unit × 1min/60sec = 1min/20units

(c) Process capacity of stage cutting = 15units/2min × 60min/1hour = 450units/hour

(d) If the capacity of the new employee is 1unit/2sec, the process capacity = 1unit/2sec × 3600sec/1hour = 1800units/hour. The process capacity increases 4 times (1800/450 = 4)

7 0
3 years ago
Plssssssssss help me Graph y= –73x+2.
UkoKoshka [18]

Answer:

Step-by-step explanation:

bbc in my throat

4 0
2 years ago
Read 2 more answers
What is 4/6 divided by 3
Tatiana [17]
2/9 is the answer hope it will help
3 0
3 years ago
Read 2 more answers
Other questions:
  • Write a problem that involeves finding the unknown measure of a side of a rectangle. Include the solution
    13·1 answer
  • HELP ME PLEASE!!!!
    8·2 answers
  • A vertical line and a horizontal line are perpendicular. Sometimes, always or never true.
    15·2 answers
  • What is the value of the interquartile range of the dea below?<br><br> 4 5 8 13
    14·2 answers
  • 2. What is the difference between 4 and -5?
    11·1 answer
  • Some one help <br> 10x + 7– 4x-1
    10·1 answer
  • A gaming system costs $150.
    10·1 answer
  • A study was done to determine the average number of homes that a homeowner owns in his or her lifetime. For the 50 homeowners su
    5·1 answer
  • A building in a city has a rectangular base. The length of the base measures 75ft less than three times the width. The perimeter
    6·1 answer