Answer:
a) Portfolio ABC's expected return is 10.66667%
Explanation:
The expected return is based on the risk factor of a project. If a project has higher risk its rate of return will be higher. Portfolio ABC has one third of its funds invested in each stock. The return of on A and B are 20% and 10%. Their beta is 1.0 for both the stocks while stock C has beta 1.4. The portfolio expected return will be 10.66667%.
Answer:
Variable manufacturing overhead rate variance= $664 favorable
Explanation:
Giving the following information:
Variable overhead 0.2 hours $ 5.10 per hour
The company used 1,660 direct labor-hours to produce this output. The actual variable overhead cost was $7,802.
<u>To calculate the variable overhead rate variance, we need to use the following formula:</u>
Variable manufacturing overhead rate variance= (standard rate - actual rate)* actual quantity
Actual rate= 7,802/1,660= $4.7
Variable manufacturing overhead rate variance= (5.1 - 4.7)*1,660
Variable manufacturing overhead rate variance= $664 favorable
Presto will record the acquisition cost of the equipment as $22,250 (21,500+430+320) which is the total cost for making the fixed asset ready for operation. The Generally accepted accounting principle requires a company to record all of the acquisition cost of a fixed asset. Thus, Presto company must capitalize all cost related to the fixed asset.
I'm guessing it's like half of that.
So 3%.
However, I saw online 4.9 %
Answer:
An elevator pitch, elevator speech, or elevator statement is a short description of an idea, product, or company that explains the concept in a way such that any listener can understand it in a short period of time.