1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Anna11 [10]
3 years ago
14

What is 7, 14, 3, 14, 0, 1, 14, 5, 14, 16, 0 from least to greatest

Mathematics
2 answers:
blagie [28]3 years ago
6 0
0,0,1,1,1,3,4,4,5,14,14,14,14,16,17
klemol [59]3 years ago
4 0
0,0,1,3,5,7,14,14,14,14,16
You might be interested in
Question Help When purchasing bulk orders of​ batteries, a toy manufacturer uses this acceptance sampling​ plan: Randomly select
horrorfan [7]

Answer:

The probability is P(X  \le 2 ) = 0.9072

The company will accept 90.72% of the shipment and will reject (100 -90.72) =  9.2\% of the shipment , so many of the shipment are rejected

Step-by-step explanation:

From the question we are told that

   The  sample size is  n =  36

   The  proportion that did not meet the requirement is  p =  0.03

Generally the probability that the whole shipment is accepted is equivalent to the probability that there is at most 2 batteries that do not meet the requirement , this is mathematically represented as

     P(X  \le 2 ) = [ P(X =  0 ) +  P(X =  1 ) + P(X = 0)]

=>   P(X  \le 2 ) = [ [^{n}C_0 * (p)^{0} *(1-p)^{n-0} ] +  [^{n}C_1 * (p)^{1} *(1-p)^{n-1} ] +  [^{n}C_2 * (p)^{2} *(1-p)^{n-2} ]]

Here C stands for Combination (so we will be making the combination function in our  calculators )

So

=> P(X  \le 2 ) = [ [^{36}C_0 * (0.03)^{0} *(1-0.03)^{36-0} ] +  [^{36}C_1 * (0.03)^{1} *(1-0.03)^{36-1} ] +  [^{36}C_2 * (0.03)^{2} *(1-0.03)^{36-2} ]]

=> P(X  \le 2 ) = [ [1 * 1 * 0.3340  ] +  [36* 0.03 *0.3444 ] +  [630 * 0.0009 *(0.355 ]]

=>P(X  \le 2 ) = 0.9072

The company will accept 90.72% of the shipment and will reject (100 -90.72) =  9.2\% of the shipment , so many of the shipment are rejected

 

8 0
3 years ago
Which of the following equations describes the line shown below? Check all
nexus9112 [7]

Answer:

C and D

Step-by-step explanation:

The equation of a line in point- slope form is

y - b = m(x - a)

where m is the slope and (a, b) a point on the line

Calculate m using the slope formula

m = \frac{y_{2}-y_{1}  }{x_{2}-x_{1}  }

with (x₁, y₁ ) = (- 3, - 6) and (x₂, y₂ ) = (9, 3) ← 2 points on the line

m = \frac{3+6}{9+3} = \frac{9}{12} = \frac{3}{4}

Using (a, b ) = (9, 3 ) , then

y - 3 = \frac{3}{4} (x - 9) → C

Using (a, b ) = (- 3, - 6 ), then

y - (- 6) = \frac{3}{4} (x - (- 3) ) , that is

y + 6 = \frac{3}{4} (x + 3) → D

4 0
3 years ago
A factory makes an oil mixture by mixing oils of grades A and B as follows. For every 2.3 liters of grade A oil, 1.2 liters of g
lozanna [386]
<span>To produce 1000L of mixture the factory will need 657 liters of grade A and 343 liters of grade B. To determine this you have to figure out the percentage of each grade in the mixture. The ratio is 2.3 liters to 1.2 liters. Therefor in this scenario the unit equaling 100% is 3.5 liters. To find the percentage of grade A you divide the amount used by the total amount of the unit 100%: 2.3 divided by 3.5 = .657 (multiply the answer by 100 to get 65.7%). To find the percentage of grade B you divide the amount used by the total amount of the unit 100%: 1.2 divided by 3.5 = .343 (multiply the answer by 100 to get 34.3%) To test your answer make sure both percentages add up to 100%: 65.75 plus 34.35 = 100% To determine how much of grade A and grade B is needed for a set amount of liters you multiply the percentage by the liters needed. For this situation you multiply 65.7% (when multiplying percentages you need to multiply in decimal form). For grade A you multiply .657 (65.7%) by 1000 liters = 657 liters For grade B you multiply .343 (34.3%) by 1000 liters = 343 liters To test your answer you can use the same addition as you did to test the percentages: 657 liters plus 343 liters = 1000 liters</span>
4 0
3 years ago
Read 2 more answers
29, 19, 9, -1, ... <br> please help me out;(
anyanavicka [17]
The next one is -11.
7 0
3 years ago
Read 2 more answers
The accepted value of the average distance between Earth and the moon is 384, 467 km. If a scientist measures that the moon is 3
Karo-lina-s [1.5K]

Answer:

Percentage error is 0.0024 %

Step-by-step explanation:

Initial average distance between Earth and moon = 384467 km  

Distance measure by the scientist = 384476 km

Total variation in the distance calculation = 384476 – 384467 = 9 km.

Now we can find the percentage by dividing the variation in distance from the initial measurement and then multiply with hundred.

Percentage error = ( 9 /  384467 ) × 100 = 0.0024 %

4 0
3 years ago
Other questions:
  • What is x please help
    6·1 answer
  • Gary owns a taco truck. He charges $3.49 for a nacho taco and $4.99 for a cool ranch taco. How much does Gary make if 15 nacho t
    12·1 answer
  • 21.50 of the seats for the football game have been sold. This is equal to what decimal?
    12·1 answer
  • A few years ago, a survey commissioned by The World Almanac and Maturity News Service reported that 51% of the respondents did n
    8·1 answer
  • Question 10
    11·2 answers
  • The graph of linear function f passes through the points (-8,-2) and (4,4). What is the x-intercept of f?
    6·1 answer
  • (-3,3.6) (5,2) what is the rate of change of y with respect to x for this function.
    11·1 answer
  • PLEASE HELPP ITS TIMEDD just write down your answer its not multiple choice
    13·2 answers
  • Which of the following equations is equivalent to 3/4a-6=1/4
    11·1 answer
  • 1. Solve each system of linear equations below, then check your work.
    8·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!