Answer:
Probability that the sample mean comprehensive strength exceeds 4985 psi is 0.99999.
Step-by-step explanation:
We are given that a random sample of n = 9 structural elements is tested for comprehensive strength. We know the true mean comprehensive strength μ = 5500 psi and the standard deviation is σ = 100 psi.
<u><em>Let </em></u>
<u><em> = sample mean comprehensive strength</em></u>
The z-score probability distribution for sample mean is given by;
Z =
~ N(0,1)
where,
= population mean comprehensive strength = 5500 psi
= standard deviation = 100 psi
The Z-score measures how many standard deviations the measure is away from the mean. After finding the Z-score, we look at the z-score table and find the p-value (area) associated with this z-score. This p-value is the probability that the value of the measure is smaller than X, that is, the percentile of X.
Now, Probability that the sample mean comprehensive strength exceeds 4985 psi is given by = P(
> 4985 psi)
P(
> 4985 psi) = P(
>
) = P(Z > -15.45) = P(Z < 15.45)
= <u>0.99999</u>
<em>Since in the z table the highest critical value of x for which a probability area is given is x = 4.40 which is 0.99999, so we assume that our required probability will be equal to 0.99999.</em>
Answer:
a. 3.2 cm
b. 6.25 km
Step-by-step explanation:
a.
(4 km)/(5 km) = 0.8
4 km is 0.8 of 5 km, so in the map it is 0.8 of 4 cm.
0.8 * 4 cm = 3.2 cm
Answer: 3.2 cm
b.
(5 cm)/(4 cm) = 1.25
5 cm is 1.25 times 4 cm, so it represents 1.25 * 5 km.
1.25 * 5 km = 6.25 km
Answer: 6.25 km
Answer:
4,5,27
Problem:
Boris chose three different numbers.
The sum of the three numbers is 36.
One of the numbers is a perfect cube.
The other two numbers are factors of 20.
Step-by-step explanation:
Let's pretend those numbers are:
.
We are given the sum is 36:
.
One of our numbers is a perfect cube.
where
is an integer.
The other two numbers are factors of 20.
and
where
.

From here I would just try to find numbers that satisfy the conditions using trial and error.






So I have found a triple that works:

The numbers in ascending order is:

option B
Explanation:
The cost of renting per hour = $2
For 1 hour = $2
For each additional hour, it is $1
For 2 hours = First hour + 1(additional hour)
For 2 hours = $2 + $1(1) = 2+1 = $3
For 3 hours = $2 + $1 (2) = 2+2 = $4
For 4 hours = $2 + $1(3) = 2+3 = $5
The graph which shows this rental cost as 2, 3, 4, 5 is option B
4 5/12 you just add the fractions