Answer:
a. Low-end
Explanation:
Low end tools is usually recommended for small projects and single users. Low end is referred to the lowest priced merchandise in a manufacturer's line. This is good for smaller projects and freelancers. Low-end tools provide basic project management features and generally cost less for each user They are often recommended for small projects and single users.
This is an example of using fiscal policy to stimulate the economy
Explanation:
Use of fiscal policy or in this case fiscal deficit even, is a strategy some economies use so that the flow of the money remains the same even when the economy nears slow down.
The concept is that the country will be able to retrieve all the money back once the slowdown is over but if it gets worse then there is a little chance of getting more money .
So in long term the deficit actually is profitable.
Answer:
The correct answer is option c.
Explanation:
The required reserve ratio is 10%.
i. Jane deposits $1,000 into a checking account. This will increase the bank's reserves. An increase in reserves will lead to an increase in the money supply.
Increase in money supply
=
=
= $10,000
ii. If the Fed purchases $1000 worth of securities from a commercial ban, it will pay the bank for it. This will cause the bank reserves to increase. The bank will be able to increase lending. In this way, money supply will increase.
Increase in money supply
=
=
= $10,000
So both will cause the money supply to increase by the same amount.
A Deliverable-Based Work Breakdown Structure clearly demonstrates the relationship between the project deliverables (i.e., products, services or results) and the scope (i.e., work to be executed). Figure 1 is an example of a Deliverable-Based WBS for building a house. Figure 2 is an example of a Phase-Based WBS for the same project.
wbs chart, work break down structure, deliverable based
Figure 1 – Deliverable Based Work Breakdown Structure
In Figure 1, the Level 1 Elements are summary deliverable descriptions. The Level 2 Elements in each Leg of the WBS are all the unique deliverables required to create the respective Level 1 deliverable.
Answer:
The capability index for process H, K and T are 0.94, 1 and 1.33 respectively ( chose lowest one between upper and lower capability index ).
On the basis of capability criteria one can say that only process-T is capable.