Answer:
95.64% probability that pledges are received within 40 days
Step-by-step explanation:
Problems of normally distributed samples are solved using the z-score formula.
In a set with mean
and standard deviation
, the zscore of a measure X is given by:

The Z-score measures how many standard deviations the measure is from the mean. After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X, that is, the percentile of X. Subtracting 1 by the pvalue, we get the probability that the value of the measure is greater than X.
In this problem, we have that:

What is the probability that pledges are received within 40 days
This is the pvalue of Z when X = 40. So



has a pvalue of 0.9564
95.64% probability that pledges are received within 40 days
Answer:
-5.457875
Step-by-step explanation:
That would be simplified into
1.41 • 1.73 • 2.82 = 6.9
i don’t know what the choices are bc you didn’t put them but hopefully this does someone some good <3
1 joule = 6,242e+18ev
20 joule = 20 joule *6,242e+18 ev/joule =1,248e+20 ev
1,248e+20 ev / (10 ev / photon) =1,248e+19 photons.