The plumber's 2 hour and 26 min plumbing bill cost is $73
What is the plumber's per minute rate?
The plumber's per minute rate is the per half-hour rate divided by 30 minutes since the plumber charges $15 for every 30-minute job
per-minute rate=$15/30
per-minute rate=$0.50
Now, let us convert 2hours and 26 minutes to minutes, in other words, every 1 hour is 60 minutes, the two hours equal 120 minutes plus the 26 minutes gives a total of 146 minutes
Total minutes=120 min+26 min
total minutes=146 minutes
Total plumbing bill cost for 146 minutes is $0.50, the per-minute rate multiplied by the number of minutes the plumber needs to work in this case
2 hour and 26 min plumbing bill cost=146*$0.50
2 hour and 26 min plumbing bill cost=$73
Find out more about hourly rate on:brainly.com/question/4468523
#SPJ1
Answer:
A. negative correlation
Step-by-step explanation:
Let two variables x and y, the correlation coefficient r measure to what degree the variables x and y are related.
--- If this coefficient is positive then the relationship will be positive. This means that even an increase in the variable x will produce an increase in the variable y. In the dispersion diagram the points will be grouped, simulating a line of positive slope.
--- If this coefficient is negative then the relation will be negative. This means that even an increase in the variable x will produce a decrease in the variable y. In the dispersion diagram the points will be grouped, simulating a negative slope line.
In the diagram shown it can be noted that as the variable x increases the variable y decreases.
Therefore it can be concluded that the correlation between x and y is negative. The correct option is option A
Answer: 2
Step-by-step explanation: (2x-4)
Answer:
0.1587
Step-by-step explanation:
Given the following :
Mean (m) of distribution = 64 inches
Standard deviation (sd) of distribution = 2 inches
Probability that a randomly selected woman is taller than 66 inches
For a normal distribution :
Z - score = (x - mean) / standard deviation
Where x = 66
P(X > 66) = P( Z > (66 - 64) / 2)
P(X > 66) = P(Z > (2 /2)
P(X > 66) = P(Z > 1)
P(Z > 1) = 1 - P(Z ≤ 1)
P(Z ≤ 1) = 0.8413 ( from z distribution table)
1 - P(Z ≤ 1) = 1 - 0.8413
= 0.1587