Answer:
b. lw $t4, 4($t0)
c. add $t3, $t5, $t4
Explanation:
Pipeline hazard prevents other instruction from execution while one instruction is already in process. There is pipeline bubbles through which there is break in the structural hazard which preclude data. It helps to stop fetching any new instruction during clock cycle.
A many periphels can be used
Answer:
integer
Explanation:
this data type must be a number, but it will always be a whole number, so boolean is not appropriate. This means that it will be integer data type
Answer:
When the report is too long and complex. The executive summary provides a snapshot of what the report talks about at a high level. When the reader needs more details, they can go through the detailed report.
Explanation: