  • Engineering
masha68 [24]
3 years ago
14

A project can be completed by 8 workers in 30 days. In order to complete the project sooner, the company plans to hire additiona

l workers. How many total workers are needed to complete the project in 16 days?
Mathematics
1 answer:
WARRIOR [948]3 years ago
6 0

Answer:15

Step-by-step explanation:

Given

8 Workers can a work in 30 days

i.e. 1 workers can do the same job in 8\times 30=240\ days

If additional workers is hired to do the same work in 16 days

suppose Now x no of workers do the job so, one worker will do the same job in x\times 16

No of days require to complete the job by one worker  remains the same (considering all are equally efficient)

240=x\times 16

x=15\ workers

So a total of 15 workers is required to do the same job in 16 days

You might be interested in
Cole is having his car repaired. The mechanic said it would cost at least $375 for parts
const2013 [10]

Answer:3.75 hours

Step-by-step explanation:

7 0
3 years ago
Read 2 more answers
Find the mean, median, mode, and range of this data: 49, 49, 54, 55, 52, 49, 55. If necessary, round to the nearest tenth.
krok68 [10]

Answer:

Mean = 51.4.

Mode = 49.

Median = 52.

Range = 6.

Step-by-step explanation:

Mean = Sum of all observations / Number of observations.

Mean = (49+49+54+55+52+49+52)/7

Mean = 360/7

Mean = 51.4 (to the nearest tenth).

Mode = The most repeated values = 49 (repeated 3 times).

Range = Largest Value - Smallest Value = 55 - 49 = 6.

Median = The central value of the data.

First, arrange the data in the ascending order: 49, 49, 49, 52, 54, 55, 55.

It can be seen that the middle value is 52. Therefore, median = 52!!!

7 0
3 years ago
When the outliers are removed, how does the mean change? dot plot with 1 on 50, 1 on 76, 1 on 78, 2 on 79, 1 on 80, 1 on 81, 2 o
sveticcg [70]
We can plot this data on MS Excel and determine the distribution of these data reflected on the graph. Among these numbers, 50 is the outlier since it is very far from the other numbers ranging from 76 to 83. We can perform interquartile range to determine or verify the outliers in the data set. In this respect, we can see that there is not much distribution seen. The average of all data sets is equal to 96.25. When the outlier (50) is removed, we expect the mean to become higher since a low number was ommitted including high numbers only. Outliers are obtained from special causations such as human errors. 

5 0
3 years ago
Read 2 more answers
What is the span of the roof? A. 4 ft B. 12 ft C. 18 ft D. 24 ft
RoseWind [281]

Answer:

  D.  24 ft

Step-by-step explanation:

The slope of 1/3 means the rise is 1/3 the run for each half of the span. The rise is shown as 4 ft, so the half-span is 3·4 ft = 12 ft.

The span of the roof is 24 ft.

4 0
3 years ago
PLEASE HELP ASAP!!! CORRECT ANSWERS ONLY PLEASE!!!
MAXImum [283]

The last option is the answer. You can double check by substituting the -3 for the x values and the 17 for y values and the statements would be true.

4 0
4 years ago
Other questions:
  • 1 hundredth plus 3 tenths equals
    15·1 answer
  • You start at (-1,-3). You move left 2 units and right 6 units. Where do you end?
    8·1 answer
  • This shows two options provided by a high-speed Internet provider.
    15·1 answer
  • A spinner with 9 equal sections is numbered 1 through 9. The probability of spinning a 1 or a 9 is 2/9 .
    8·2 answers
  • Which of the following equations has the same solution as 3x-5=5x+11?
    7·2 answers
  • Find the coordinate of the midpoint of GH with endpoints G(-5,4) and H (-5,8)
    5·1 answer
  • Molly bought 12.5 yards to make dog beds. She uses 2.5 yards of fabric for each dog bed. She sells each dog bed for 17.50. After
    8·2 answers
  • Which ordered pair is a solution to the system of linear equations below?<br> y= 1/4x+2<br> y= x-1
    15·2 answers
  • Angle K and angle L are complementary angles. If angle k = (3x + 3)" and angle k= (10x - 4)". find the
    10·1 answer
  • If Jose earned 145.60 for 7 hours, how many hours would he have to work to earn $83.20?
    9·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!