y increases as x increases
Answer: 1. When you estimate, it is not an exact measurement. 3ft 8 in gets rounded to 4ft and 12 ft 3 in rounds to 12ft. now find the perimeter. P=2l+2w P= 2*12 +2*4 P=32feet
2. 3ft 8in = 3 8/12 or reduced to 3 2/3 12ft 3in = 12 3/12 or reduced to 12 1/4 The fractional part is referring to a fraction of a foot.
3. The perimeter of the room is P=2l+2w or P=2(12 1/4) + 2(3 2/3) p=24 1/2 + 7 1/3 P= 31 5/6 feet
4. The estimate and the actual are very close. They are 1/6 of a foot apart.
5a. Total baseboard 31 5/6ft - 2 1/4 ft = 29 7/12 feet needed.
5b. Take the total and divide it by 8ft = 29 7/12 divided by 8= 3.7 You are not buying a fraction of a board so you would need 4 boards.
In An arithmetic sequence will add or subtract the same thing each time to find the next term. In this case we start with 10 and need to get to 40 on the 6th term. This is a difference of 30 that needs to be divided by 5 open spaces. You are adding 6 each time.
10, 16, 22, 28, 34, 40, _,_,_,_, 70, _,_,_,_,100,_,_,_, 124.
Another way to do this would be to look at the 5th term and multiply it by 4 to get to the 20th term. 34 x 4 = 124.
C = 220T + 1890.
Solve the equation for T.
220T = C - 1890
T = C/220 - 8.6
The steel produced is expected to be sold at a price of $310 per ton.
310 $/ton is a rate or slope. Write a linear equation where x is tons of steel produced and y is selling price of the steel.
y = 310x
Write and solve an equation to find the amount of steel produced if the selling price is equal to the cost of production.
* Here, note that the cost of production and tons of steel in the first equation is in the millions. The equation we just wrote for the selling price was in x tons of steel. This only matters in regards to the units you specify because; million/million = 1
The unit multiplier of all variables must be specified as same. Either everything is in millions or not.
Here, I'll leave everything in millions, change x (tons of steel) to T (mill tons steel) and "y" to "S" in million dollars selling price.
S = 310T
Set equal to Cost equation.
220T + 1980 = 310T
Solve for T, million tons of steel produced.
1980 = 310T - 220T
1980 = 90T
T = 1980/90
T = 22 million tons steel produced
Meter/ yard. Likely meter since that is high/college standard