Answer:
0.15
Step-by-step explanation:
Fp: frequency that the pitcher will throw exactly 4 pitches to a batter=15
Fa: frequency that the pitcher will throw any pitches to a batter=15+20+40+15+10=100
P=Fp/Fa=15/100=0.15
The second condition tells you that

is half the size of

, so

, which could be rewritten in several ways. In standard form, that would be

.
Answer:
17^5+17^4 = 17^4 * (17^1 + 1) = 17^4 * 18
Step-by-step explanation:
Answer:
2580 ft-lb
Step-by-step explanation:
Water leaks out of the bucket at a rate of
Work done required to pull the bucket to the top of the well is given by integral
Here, function
is the total weight of the bucket and water
feet above the bottom of the well. That is,
is the initial height and
is the maximum height of well. That is,
Find the work done as,


![&\left.=46x-0.05 x^{2}\right]_{0}^{60}](https://tex.z-dn.net/?f=%26%5Cleft.%3D46x-0.05%20x%5E%7B2%7D%5Cright%5D_%7B0%7D%5E%7B60%7D)


Hence, the work done required to pull the bucket to the top of the well is 
The norm of a vector
is equal to the square root of the inner product of
with itself.
a. 
b. 