y=kx+b
for (7,-8): -8=7k+b. (function 1)
for (-4,6): 6=-4k+b (function 2)
Use function 2 - function 1
we get: 14=-11k
k=-14/11------>slope is -14/11
Now we know that first two options are wrong since they have the wrong slope for the function.
Plus -14/11 back to function 1/ or 2. Both are correct and can give you the answer. In this case I would plug it back to function 2.
6=14*4/11+b
b=66/11-56/11
b=10/11
We get y=-14/11x+10/11
subtract both side by 6.
y-6=-14/11x+10/11-66/11
y-6=-14/11x-56/11
y-6=-14/11(x+4)
So C is correct
<span>Let's solve your equation step-by-step.<span><span><span>5x</span>+<span><span>12</span><span>(<span><span>4x</span>+8</span>)</span></span></span>=25</span>Step 1: Simplify both sides of the equation.<span><span><span>5x</span>+<span><span>12</span><span>(<span><span>4x</span>+8</span>)</span></span></span>=25</span></span><span>Simplify: (Show steps)</span><span><span><span><span>7x</span>+4</span>=25</span>Step 2: Subtract 4 from both sides.<span><span><span><span>7x</span>+4</span>−4</span>=<span>25−4</span></span><span><span>7x</span>=21</span>Step 3: Divide both sides by 7.<span><span><span>7x</span>7</span>=<span>217</span></span><span>x=3</span><u>Answer:</u><span>x=<span>3</span></span></span>
Maybe try dividing 1092 by 21 I got 52
Answer:
12.16 it's a continues answer tho
First we have to find the area. To do that, we first have to find the side lengths of the square. Since a square has all four sides same length, we can find this by dividing: 52/4 = 13
Now we'll find the area in square meters: 13 * 13 = 169
So the area is 169 square meters.
So to find out how much that will cost, we will multiply the number of square meters by the amount it cost per square meter: 169 * $5 = $845
So it will cost $845