The answer is -1.01
I first changed the signs of the ones i could. So <span>-0.75+(2/50)+0.4(-3/4)
Then i multiplied the 0.4*-3/4 which equals -0.3
So you are left with </span><span>-0.75+(2/50)-0.3
2/50 is equal to 0.04 so now it is </span> -0.75+0.04-0.3 and the rest is simple math. Which equals -1.01
Answer:
$1800
Step-by-step explanation:
Volume of the foundation: 30*12*6 = 2160 cubic feet
we need to convert this into yards because a truckload is 8 cubic yards, 2160/3 = 720 cubic yd
One truckload is 8 cubic yards
# of truckloads needed: 720/8 = 90 truckloads
Cost: $20*90 = $1800
Answer:
2.64 sales tax
Step-by-step explanation:
hope i helped you