Answer:
first one: <u>3</u>
second one: <u>b</u>
third one: <u>3.2</u>
Step-by-step explanation:
first one:
21 x ________ ÷ 3 = 21
rewrite equation:
21 ÷ 3 x ___ = 21
7 x ___ = 21
(21 / 7 = 3)
7 x 3 = 21
second one:
b x h ÷ h = ___
B
third one:
876 x 3.2 ÷ ______ = 876
2803.2 ÷ ___ = 876
(2803.2 / 876 = 3.2)
2803.2 x 3.2 = 876
Answer:
Step-by-step explanation:
The least number of degree is 3 and the third root should be (4 - i) to make polynomial rational.
<u>The polynomial is:</u>
- (x - 3)(x - (4 + i))(x - (4 + i)) =
- (x - 3)(x² -x(4 + i + 4 - i) + (4 + i)(4 - i)) =
- (x - 3)(x² - 8x + 16 - (-1)) =
- (x - 3)(x² - 8x + 17) =
- x³ - 8x² + 17x - 3x² + 24x - 51 =
- x³ - 11x² + 41x - 51
Answer: 3
Step-by-step explanation:
1. Convert the mixed number to fraction:
- Multiply the denominator of the fraction by the whole number.
- Add the product obtained and the numerator of the fraction.
- Write the sum obtained as the numerator and rewrite the original denominator of the fraction.
Then:

2. Multiply the numerators.
3. Multiply the denominator.
4. Reduce the fraction.
Then:

It’s number 12!!!!! I know it already got answered
Hello! Your answer is B, 10 minutes.
Say the x = minutes taken to do the job. You can set up an equation like this to solve this.

This is representative of the situation. The fractions each represent <u>how much each person does in a minute</u>, and when they're multiplied by x, that's <u>how much of the project they get done</u> based off of the minutes they work together on the job. Add the two together, and you get <u>how much of the project is finished in x amount of time</u>. Set it equal to 1, as you are looking for 100% completion.
Once you have this equation, find a common denominator, add, and solve.





Therefore, it will take them 10 minutes to do the job together.
Hope this helps!