The ratio of sediment yield of a drainage basin to the total amount of sediment moved by sheet erosion and channel <span>erosion.</span>
Answer:
5x - 18
Step-by-step explanation:
-3(x + 6) + 8x
Multiply
(-3 * x) + (-3 * 6) + 8x
-3x + (-18) + 8x
5x - 18
Hope this helps :)
Answer:
your answer is "18"
Step-by-step explanation:
Formula is:
A= 1/2 (A+B) X H
A = 1/2 (CD + CF) X H
A = 1/2 (5+6) X 3
A = 16.5 CM SQUARED
Hope this is right!
Answer:
180
Step-by-step explanation:
1. Write a proportion.
=
2. Cross multiply.
6x60=360
360/2=180
x=180
OR
1. Write a proportion.
=
If you look at the bottom, since 2 times 30 is 60, 6 times 30 is 180, making the fractions equal.
Answer:
its letter A
Step-by-step explanation: