1.7 s<span>, then the </span>velocity<span> of the </span>baseball<span> is 22.35 </span>m/s<span> toward first base. hope this helps.</span>
It's the third graph, the one where the absolute function is opening downwards
Answer:
Distance of Tunnel is 500 meters + Train travel rate is 20 meters per second = 25 seconds to pass through the tunnel only therefore the outstanding balance of 35 seconds x 20 meters per second =600 meters Train
Step-by-step explanation:
Total of length of train 600 meters and tunnel (500 meters) is 1,200 meters +30 seconds = TR of 20 meters per second
Given:
p = 7.6% = 0.076, the percentage of people who stay overnight at the hospital.
E = 1.5% = 0.015, margin of error
95% confidence interval.
The standard error is
Es =

where
n = the sample size.
The margin of error is

where
z* = 1.96 at the 95% confidence level.
Because the margin of error is given, there is no need to calculate it.
The 95% confidence interval is
p +/- E = 0.076 +/- 0.015 = (0.061, 0.091) = (6.1%, 9.1%)
Answer:
The 95% confidence interval is between 6.1% and 9.1%.
The square root of 9800=
= 70 * square root of 2