The answer is 0.88889, because:
Order of Operations-
1) Add 30 plus 6 to get 36
2) Subtract 32 from 36 to get 4
3) Divide 4 by 9 to get 0.4444444
4) Multiply 0.4444444 by 2 to get 0.888889
Good luck! <3
Hello, Tennant17!
The model for direct variation is y=kx where k is a constant.
In this case, y is m and x is t.
So the equation is m=kt
Plug in the values of m and t to find k.
19= k * 2
Solve for k
k= 19/2
k= 9.5
Plug k back into the equation.
m=9.5t
So the answer is:
B. m=9.5t
Hope this helps :)
Answer:
Each Lap= 83 seconds
83 seconds= 1 min and 23 sec
Step-by-step explanation:
I divided the numbers.
Hope this helped!
Answer:
production cost f(x), in dollars, for x number of units produced by company 1:
f(x) = 0.05x^2 − 7x + 300
2) Table that represents the production cost g(x), in dollars, for x number of units produced by company 2:
x g(x)
0.6 899.58
0.8 899.52
1 899.50
1.2 899.52
1.4 899.58
3) Comparison: do a table for f(x) with the same x-values of the table for g(x).
x f(x) = 0.05x^2 − 7x + 300 g(x)
0.6 295.818 899.58
0.8 294.432 899.52
1 293.05 899.50
1.2 291.672 899.52
1.4 290.298 899.58
As you can see the values of f(x) are consistently lower than the values of g(x) for the same x-values.
The minimum production cost for company 2 is around 899.50 at x = 1, while the minimum production cost of company 1 is defintely lower (lower than 292.298 for sure, in fact if you find the vertex it is 55).
Answer: Based on the given information, the minimum production cost for company 2 is greater.
Step-by-step explanation:
<h3><u>
Answer:</u></h3>
<h3><u>
Step-by-step explanation:</u></h3>
- 56 + y + (180 - 123) = 180
- => 56 + y + 57 = 180
- => y = 180 - 113
- => y = 67°
<h3><u>Conclusion:</u></h3>
Therefore, the answer is y = 67°.
Hoped this helped.
