Ok so assuming you don't get tired and the rate stays the same
rate=amountwork/timeitdonein
rate=800/15
euals
6000/time
800/15=6000/time
simlify for ease
160/3=6000/time
multiply both sides by 3time
160time=18000
divide both sides by 160
time=112.5
means 112.5 minutes or 1hour, 52 minutes, 30 seconds
A. 800/15=6000/t or
15/800=t/6000
B. solved, 112.5 minutes
Area=legnth times width
legnth=16 ft
width=3 ft
but wait, they want the area in squazre METERS
so convert feet to meters
1 foot=0.3048 meters
convert 16 feet and 3 feet to meters
16 feet=16 times 0.3048=4.8768
3 feet=3 times 0.3048=0.9144
so the area is now
legnth=4.8768 m
width=0.9144m
area=4.8768 m times 0.9144 m=4.45934592
round
4.0
answer is 4 square METERS
4 m^2
Answer:
B and C
Step-by-step explanation:
Uses my calculator and put the table in for worker be and thats how i found the slope was 12.5 . then i used to to figure out that when the hour got to 10 worker B starts making more money.
The y-intercept of this graph represents 20min
Answer:
u cannot factor it not possible
Step-by-step explanation: