Answer:
364
Step-by-step explanation:
2x2x7x13
The prime factorization is just the factors of a number.
To find the number, multiply the numbers together
2*2 = 4
4*7 = 28
28*13 = 364
Answer:
For the 99th percentile, we have X = 206 seconds.
Step-by-step explanation:
Problems of normally distributed samples can be solved using the z-score formula.
In a set with mean
and standard deviation
, the zscore of a measure X is given by:

The Z-score measures how many standard deviations the measure is from the mean. After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X, that is, the percentile of X. Subtracting 1 by the pvalue, we get the probability that the value of the measure is greater than X.
In this problem, we have that:

99th percentile:
Value of X when Z has a pvalue of 0.99. So we use 




For the 99th percentile, we have X = 206 seconds.
Answer: its is square pyramid or D
Step-by-step explanation:
Answer:
Step-by-step explanation:
Rachel worked for 3 2/3 hours.
Multiply the fractions to get the answer.
2 3/4 x 1 1 /3 is 3 2/3.
Hope it helps you :D
Answer:
(-3, 2)
Step-by-step explanation:
Given that point Q, partitions segment PE, such that PQ:QE is 1:3, coordinates of point Q is found using the formula below:


Where,



Plug in the necessary values to find x and y coordinates for point Q as follows:










The coordinates of the point Q are (-3, 2))