1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Delvig [45]
3 years ago
8

Determine whether the system is consistent, inconsistent, or dependent.

Mathematics
1 answer:
Harlamova29_29 [7]3 years ago
7 0
Consistent ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,
You might be interested in
The distance between the points (7,2) and (7 –9)
Angelina_Jolie [31]
The distance between both points is 11
6 0
3 years ago
Which two theorems would justify that m∠4 = m∠6, given that m∠5 = m∠6 in the diagram below?
My name is Ann [436]

Answer: D) vertical angles theorem, alternate interior angles theorem

Angle 5 = Angle 6 by the alternate interior angles theorem

Angle 5 = angle 4 by the vertical angles theorem

By the transitive property, we can then say angle 4 = angle 6. These angles are also corresponding angles.

We won't use the angle addition theorem or the right angles theorem.

4 0
3 years ago
Read 2 more answers
Plz help ima fail my class if I don’t get this one
Fofino [41]

Answer:

its the first one

Step-by-step explanation:

8 0
3 years ago
Read 2 more answers
Use cubes. color and draw to show a way to take apart 7.
Ray Of Light [21]
What do you mean
give details
then i could help you




7 0
3 years ago
Joe used a project management software package and has determined the following results for a given project.: Expected completio
statuscvo [17]

Answer:

0.1151 = 11.51% probability of completing the project over 20 days.

Step-by-step explanation:

Normal Probability Distribution

Problems of normal distributions can be solved using the z-score formula.

In a set with mean \mu and standard deviation \sigma, the z-score of a measure X is given by:

Z = \frac{X - \mu}{\sigma}

The Z-score measures how many standard deviations the measure is from the mean. After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X, that is, the percentile of X. Subtracting 1 by the p-value, we get the probability that the value of the measure is greater than X.

Expected completion time of the project = 22 days.

Variance of project completion time = 2.77

This means that \mu = 22, \sigma = \sqrt{2.77}

What is the probability of completing the project over 20 days?

This is the p-value of Z when X = 20, so:

Z = \frac{X - \mu}{\sigma}

Z = \frac{20 - 22}{\sqrt{2.77}}

Z = -1.2

Z = -1.2 has a p-value of 0.1151.

0.1151 = 11.51% probability of completing the project over 20 days.

4 0
3 years ago
Other questions:
  • The graph shown here is the graph of which of the following rational functions
    13·2 answers
  • Find the surface area and volume of the triangular prism with the given measurements
    8·1 answer
  • Which of the following equations is equivalent to s=πr^2h
    14·2 answers
  • What is the least number of bowling balls to make the mode 14 pound so
    15·1 answer
  • You have a piggy bank made of only dimes and quarters. There are 42 coins and their value is $6.75. How many dimes and quarters
    10·1 answer
  • Mark wants to eat one last cookie from the cookie jar in the jar they are fire truck which of cookies six peanut butter cookies
    13·2 answers
  • Pleaseee give me sum answerssss
    14·2 answers
  • What is the domain and range of 4n/n-5 -2?
    11·2 answers
  • What is the equation of the line that passes through the point(-5,-4) and has a slope of -3/5?
    7·1 answer
  • 75,15,3 find the 6th term
    15·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!