Mike needs to write the primary objectives of a project in a project plan. He should write this under the SCOPE section of the project plan.
Explanation:
- Project scope is the part of project planning that involves determining and documenting a list of specific project goals, deliverables, features, functions, tasks, deadlines, and ultimately costs.
- It is what needs to be achieved and the work that must be done to deliver a project.
- The Scope of Work (SOW) is the area in an agreement where the work to be performed is described.
- The SOW should contain any milestones, reports, deliverables, and end products that are expected to be provided by the performing party. The SOW should also contain a time line for all deliverables.
- The scope is simply all the work that needs to be done in order to achieve a projects objectives.
- A project scope, or project scope statement, is a tool used to describe the major deliverables of a project including the key milestones, high level requirements, assumptions, and constraints.
Answer:
import numpy as np
l_int = 55/100
h_int = 65/100
hist = np.histogram( paid_tax_preparers_list, bins=5, range=(l_int, h_int))
Explanation:
Numpy is a Python package used to ease mathematical and statistical research calculations. The package creates data structures called arrays that can be used as vector items, making it easy and fast for calculation to be done.
The np.histogram method is used to create or plot histograms of a list or array against the frequency of the items in the array. The bins and the range attributes are used to adjust the display of the histogram, with bins being the number of bin in the graph and range is the given length of the histogram.
The correct answer is D. All of the above. Each of these extensions are able to execute files depending on what type of information the file contains.
Answer:
252
Explanation:
I tested the code and it outputted 252
hope i helped :D