Analyze the graph of the function f(x) to complete the statement

Mathematics
1 answer:
frutty [35]4 years ago
4 0

Answer:

link the text lol

Step-by-step explanation:

You might be interested in
Which would neatly fill the gap in the prism shown below? Check all that apply. A prism has a length of 2 and one-half, height o
Simora [160]

Answer:

12 blocks each measuring One-fourth times 1 times 1 and6 blocks each measuring one third times one time 1

Step-by-step explanation:

5 0
3 years ago
Read 2 more answers
I need help on this TT
strojnjashka [21]

Answer:

Step-by-step explanation:

4/-2

8 0
3 years ago
M5_A3. The expected project completion time for the construction of a pressure vessel is 18 monthsand the project variance is 7.
snow_tiger [21]

Answer:

a) 0.3520

b) 0.9884

c) 0.1292

d) 0.1292

e) 0.7648

Step-by-step explanation:

Problems of normally distributed samples can be solved using the z-score formula.

In a set with mean \mu and standard deviation \sigma, the zscore of a measure X is given by

Z = \frac{X - \mu}{\sigma}

After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X.

In this problem, we have that:

The expected project completion time for the construction of a pressure vessel is 18 months. So \mu = 18.

And the project variance is 7. The standard deviation is the square root of the variance, so \sigma = \sqrt{7}.

a) What is the probability that the project will require at least 19 months?

The pvalue of the zscore of X = 19 is the probability that the project will require less than 19 months. So the probability that the project will require at least 19 months is the subtraction of 1 by this pvalue.

Z = \frac{X - \mu}{\sigma}

Z = \frac{19 - 18}{\sqrt{7}}

Z = 0.38

The pvalue of Z = 0.38 is 0.6480.

So the probability that the project will require at least 19 months is 1 - 0.6480 = 0.3520.

b) What is the probability that the project will be completed within 24 months?

This is the pvalue of the zscore of X = 24.

Z = \frac{X - \mu}{\sigma}

Z = \frac{24 - 18}{\sqrt{7}}

Z = 2.27

The pvalue of Z = 2.27 is .9884. This means that the probability that the project will be completed within 24 months is .9884.

c) What is the probability that the project will require at least 21 months?

Same logic as a). We find the pvalue of the zscore of X = 21, then we subtract 1 by this value.

Z = \frac{X - \mu}{\sigma}

Z = \frac{21 - 18}{\sqrt{7}}

Z = 1.13

The pvalue of Z = 1.13 is 0.8708.

So the probability that the project will require at least 21 months is 1 - 0.8708 = 0.1292.

d) What is the probability that the project will be completed within 15 months?

Same logic as b). This is the pvalue of the zscore of X = 15.

Z = \frac{X - \mu}{\sigma}

Z = \frac{15 - 18}{\sqrt{7}}

Z = -1.13

The pvalue of Z = -1.13 is .1292. This means that the probability that the project will be completed within 15 months is .1292.

e) What is the probability that the project will take between 16 and 24 months to complete?

This is the pvalue of Z = 24 subtract by the pvalue of Z = 16.

In b), we found that the pvalue of Z = 24 is .9884

Now we find the pvalue of Z = 16

Z = \frac{X - \mu}{\sigma}

Z = \frac{16 - 18}{\sqrt{7}}

Z = -0.76

The pvalue of Z = -0.76 is 0.2236

So the probability that the project will take between 16 and 24 months to complete is 0.9884 - 0.2236 = 0.7648

8 0
4 years ago
a store sold 14.00 dollars worth of gift cards in october. the next month the goal was to sell $15.96 worth of gift points. this
solniwko [45]
Subtract 14 from 15.96 to find the increase. 
15.96 - 14 = 1.96 
Divide 1.96 by 14. 
1.96 / 14 = 0.14 
In percents that is 14%. 
This is an increase of 14%. 
Hope this helps!
4 0
3 years ago
Read 2 more answers
Jake is taking four of his friends to dinner. At the restaurant, a meal, side item, dessert, and drink cost $5.60. The first dri
KonstantinChe [14]
It's the third one! Hope this helps:3
3 0
3 years ago
Other questions:
  • PLEASE HELP ME I DONT UNDERSTAND THIS AT ALL
    6·1 answer
  • What is the value of x?
    13·2 answers
  • Dan sold 150,000 candies at the fair. he sold 10 times more candy this year than last year. how many candies did Dan sell last y
    13·2 answers
  • Factor 1
    10·2 answers
  • hummingbirds lay eggs that are nearly spherical and about 1 centimeter in diameter. Find the volume of an egg .round your answer
    11·1 answer
  • I need help ASAP please
    7·1 answer
  • The product of two numbers is 41. One of the numbers
    10·1 answer
  • What pair of angles is congruent?
    14·1 answer
  • Six statements were made about the figures below. Record the letter of the 3D figure that matches each student’s statement.
    15·1 answer
  • Four friends had dinner togethere.
    8·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!