Answer:
E, needs more info to be determined
Step-by-step explanation:
We know that Kai takes 30 minutes round-trip to get to his school.
One way is uphill and the other is downhill.
He travels twice as fast downhill than uphill.
This means that uphill accounts for 20 minutes of the round-trip and downhill accounts for 10 minutes of his trip.
However, even with this information, we do not know how far his school is.
In order to figure out how far away his school is, we would need more information about the speed at which Kai is traveling.
Simply knowing that he travels twice as fast downhill is not enough.
This question could only be solved by knowing how many miles Kai travels uphill or downhill in a given time.
Answer:
44u-36
Step-by-step explanation:
42u-36+2u
44u-36
Answer:
Both
Step-by-step explanation:
They will both give you the same answer.
-13-5 = -18
-13 + -5 = -18
The common point between y = 2x + 5 and y = (1/2)x + 6 will have the same values for x and y.
Therefore, set the two y expressions equal to obtain
2x + 5 = (1/2)x + 6
Subtract (1/2)x from each side.
(3/2)x + 5 = 6
Subtract 5 from each side.
(3/2)x = 1
Multiply each side by 2/3.
x = 2/3.
From the first equation, obtain
y = 2*(2/3) + 5 = 19/3.
The common point is (2/3, 19/3). It is not equal to (3, 1/2).
Answer: False
Answer:
0.1151 = 11.51% probability of completing the project over 20 days.
Step-by-step explanation:
Normal Probability Distribution
Problems of normal distributions can be solved using the z-score formula.
In a set with mean
and standard deviation
, the z-score of a measure X is given by:
The Z-score measures how many standard deviations the measure is from the mean. After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X, that is, the percentile of X. Subtracting 1 by the p-value, we get the probability that the value of the measure is greater than X.
Expected completion time of the project = 22 days.
Variance of project completion time = 2.77
This means that 
What is the probability of completing the project over 20 days?
This is the p-value of Z when X = 20, so:



has a p-value of 0.1151.
0.1151 = 11.51% probability of completing the project over 20 days.