Answer:
24.69
Step-by-step explanation:
Answer:
Step-by-step explanation:
Answer:
It will cost $39,337.92 for the piller.
Step-by-step explanation:
Given that,
The diameter of the cylinder, d = 8 m
Height of the cylinder, h = 9 m
If concrete cost $87 per cubic meter, we need to find how much the concrete cost for the pillar.
The volume of the cylinder is given by :
Cost per cubic meter = $87
Cost for 452.16 m³ will be :
C = 452.16 × 87
C = $39,337.92
Hence, it will cost $39,337.92 for the piller.
Answer:
1: proportional
2: non-proportional
3: non-proportional
4: non-proportional
5: proportional
6: proportional
7: non-proportional
8: proportional
9. proportional.
10. proportional.
11. non-proportional.
12. proportional.
Step-by-step explanation:
I'm unsure how the proportional ones are actually calculated depending if it requires a dot on the exact origin, but depending on what I can graphically view and assume; every graph with the line running through the origin is proportional and every graph where the line does not run through the origin is non-proportional.
8.000.000 = 800 ten thousands
hope helped