Answer:
gay gsbycvcccbvccyfgvvuxtfvcx
Step-by-step explanation:
gbcj nvjvnffffffggffffffffffffvvvvgfef
Answer:
Work done = 150 x 5 = 750 J
Step-by-step explanation:
Work done is the measure of energy transferred to an object when a force is added causing the object to move a distance in the direction of the force.
The equation for work done is force time the distance and is measured in Joules. Therefore the formula is W = F x D
work done (W) is measured in joules (J)
force (F) is measured in newtons (N)
distance (d) is in the same direction as the force and is measured in
metres (m)
W = F x D
w = 150 x 5
W = 750 J
Calculate the standard deviation for each data set:
Sample A = 1.246
Sample B = 2.924
The smaller the deviation the closer the data set is, the larger the deviation the more widespread the data set is.
Sample B has a larger deviation so the spread of the data is wider.