Answer:
13.75 is your answer
Step-by-step explanation:
find area of whole triangle 5.5*7*1/2=19.25
Find area of blank spot 5.5*2*1/2=5.5
Subtract 19.25-5.5=13.75
- 3x + 2x + 5 + 5x + 15 = 180 [angles on a line add to 180 degrees]
- 10x + 20 = 180 [combine like terms]
- 10x = 160 [subtract 20 from both sides]
- x = 16 [divide both sides by 10]
Arc AB measures 3(16) = 48 degrees.
Arc BC measures 2(16) + 5 = 41 degrees.
The formula of a midpoint:

The formula of a distance between two points:

We have the points P(3, 5) and Q(7, 5). Substitute:

<h3>M(5, 5)</h3>

<h3>Answer:</h3><h3>Midpoint = (5, 5)</h3><h3>Distance = 4</h3>
Answer:
6,0 4,8
Step-by-step explanation:
because i know
Answer:
a) 
And replacing we got:

b) ![E(80Y^2) =80[ 0^2*0.45 +1^2*0.2 +2^2*0.3 +3^2*0.05]= 148](https://tex.z-dn.net/?f=%20E%2880Y%5E2%29%20%3D80%5B%200%5E2%2A0.45%20%2B1%5E2%2A0.2%20%2B2%5E2%2A0.3%20%2B3%5E2%2A0.05%5D%3D%20148)
Step-by-step explanation:
Previous concepts
In statistics and probability analysis, the expected value "is calculated by multiplying each of the possible outcomes by the likelihood each outcome will occur and then summing all of those values".
The variance of a random variable Var(X) is the expected value of the squared deviation from the mean of X, E(X).
And the standard deviation of a random variable X is just the square root of the variance.
Solution to the problem
Part a
We have the following distribution function:
Y 0 1 2 3
P(Y) 0.45 0.2 0.3 0.05
And we can calculate the expected value with the following formula:

And replacing we got:

Part b
For this case the new expected value would be given by:

And replacing we got
![E(80Y^2) =80[ 0^2*0.45 +1^2*0.2 +2^2*0.3 +3^2*0.05]= 148](https://tex.z-dn.net/?f=%20E%2880Y%5E2%29%20%3D80%5B%200%5E2%2A0.45%20%2B1%5E2%2A0.2%20%2B2%5E2%2A0.3%20%2B3%5E2%2A0.05%5D%3D%20148)