Answer:
- 0, 3, 8, 15, 24
- y = x² + 2x
Step-by-step explanation:
<u>The pattern is</u>
- Step 1 ⇒ 1*3 = 3
- Step 2 ⇒ 2*4 = 8
- Step 3 ⇒ 3*5 = 15
<u>Next step would be</u>
<u>Step zero would be</u>
<u>The equation</u>
Answer:
7
Step-by-step explanation:
fdgrgeag
Answer: (20.86, 22.52)
Step-by-step explanation:
Formula to find the confidence interval for population mean :-

, where
= sample mean.
z*= critical z-value
n= sample size.
= Population standard deviation.
By considering the given question , we have


n= 58
Using z-table, the critical z-value for 95% confidence = z* = 1.96
Then, 95% confidence interval for the amount of time spent on administrative issues will be :





Hence, the 95% confidence interval for the amount of time spent on administrative issues = (20.86, 22.52)
Let V, be the rate in still water and let C = rate river current
If the boat is going :
upstream, its rate is V-C and if going
downstream, its rate is V+C,
But V = 5C, then
Upstream Rate: 5C - C = 4 C
Downstream rate: 5C+C = 6C
Time = distance/Rate, (or time = distance/speed) , then:
Upstream time 12/4C and
Downstream time: 12/.6C
Upstream time +downstream time:= 2h30 ' then:
12/4C + 12/.6C = 2.5 hours
3/C + 2/C = 5/2 (2.5 h = 5/2)
Reduce to same denominator :
5C = 10 and Rate of the current = 2 mi/h
1: 72
2: 32
3: 1/2
I think this is it