Answer:
$468.09
Step-by-step explanation:
first we must calculate the expected future value of the engine overhaul:
($390 x 10%) + ($570 x 30%) + ($750 x 50%) + ($790 x 10%) = $39 + $171 + $375 + $79 = $664
now we must determine the present value of $664 using a 6% interest rate:
PV = FV / (1 + r)⁶ = $664 / 1.06⁶ = $468.09
The answer would be 199/37 or 5 14/37
Answer:
D
Step-by-step explanation:
on a graph, look at the points (-3,0) (-1,0) and (2,0). Then, see if the line passes through those points. You will see that graph D passes through all those points. If you're confused on how to turn the (x,y) format into points on a graph, remember that the first point tells you how left/right you want to be, and the second point tells you how up/down you want to be.
Answer:
36
Step-by-step explanation:
25% × ? = 9
? =
9 ÷ 25% =
9 ÷ (25 ÷ 100) =
(100 × 9) ÷ 25 =
900 ÷ 25 =
36