Answer:
1,280,000 (1.28 million.)
Step-by-step explanation:
If Network B schedules its top show (with a probability of 0.7), Network A will get 1.1 million viewers.
If Network B schedules a different show during that time slot, (with a probability of 0.3), Network A will get 1.9 million viewers.
Therefore, the probability distribution table of number of viewers of Network A is:

Therefore, the expected number of viewers for Network A's top show
= (1100000 X 0.7) + (1700000 X 0.3)
=1,280,000
The expected number of viewers for Network A's top show is 1.28 million.