Since if he gets the driveway done in 20 minutes he gets 1/20th of the driveway done in 1 minute (if x=20 then x/20=1 by dividing both sides by 20) and if his brother gets 1/12th of the driveway done in one minute, then if t represents the time it takes to shovel the driveway, t/20+t/12=1 driveway shoveled as 1/20+1/12=amount they can do in 1 minute, so t/20+t/12 is how much they can do in t minutes. Multiplying both sides by 20*12=240, we get 12t+20t=32t=240. Dividing both sides by 32, we get 240/32=7.5 minutes to shovel the driveway.
Answer:
Let X the random variable that represent the delivery times of a population, and for this case we know the distribution for X is given by:
Where
and
Since the distribution of X is normal then we know that the distribution for the sample mean
is given by:
And we have;


Step-by-step explanation:
Assuming this question: The delivery times for all food orders at a fast-food restaurant during the lunch hour are normally distributed with a mean of 14.7 minutes and a standard deviation of 3.7 minutes. Let R be the mean delivery time for a random sample of 40 orders at this restaurant. Calculate the mean and standard deviation of
Round your answers to two decimal places.
Previous concepts
Normal distribution, is a "probability distribution that is symmetric about the mean, showing that data near the mean are more frequent in occurrence than data far from the mean".
The Z-score is "a numerical measurement used in statistics of a value's relationship to the mean (average) of a group of values, measured in terms of standard deviations from the mean".
Solution to the problem
Let X the random variable that represent the delivery times of a population, and for this case we know the distribution for X is given by:
Where
and
Since the distribution of X is normal then we know that the distribution for the sample mean
is given by:
And we have;


Answer:
the expected total amount of time in minutes is 88.4
Step-by-step explanation:
The computation of the expected total amount of time in minutes is given below:
= Standard deviation × needed to answer calls each day
= 1.7 × 52
= 88.4
hence, the expected total amount of time in minutes is 88.4
Answer:
B
Step-by-step explanation:
i hope it helps
#CarryOnLearning