Answer: 1 hour 20 minutes
Step-by-step explanation:
Given : The old machine could shred a truckload of paper in 4 hours.
Rate of work done by old machine = 
The new machine could shred the same truckload in 2 hours.
Rate of work done by new machine = 
Let 't' be the time taken by both of them working together , then we have the following equation:-

Since 1 hour = 60 minutes
Then, 
Hence, it will take 1 hour 20 minutes to shred the same truckload of paper if Ron runs both shredders at the same time.
I would have to go with the first one because 2(3x-5)=1 is the same as 6x-10=1
then all you have to do is divide 11 by 6 and the answetr should be c or in this case x=1.83
to check your work do this 6(1.83)-10 and your answer should come to .98
all you have to do is round to 1.0
Answer:
Slope intercept form; -4y = -3x + 9
Y-intercept; 9
Answer:
∠1 = 112°
Step-by-step explanation:
∠2 = ∠3 = 112° ( corresponding angles )
∠1 = ∠2 = 112° ( vertically opposite angles )