Answer: the rule is to add 1.5
3 + 1.5 = 4.5
4.5 + 1.5 = 6
6 + 1.5 = 7.5
etc...
Answer:
Step-by-step explanation:
= (probability of entire face value paid*face value+probability of entire face value not paid*percent of face value paid*face value)/(1+discount rate)^years to maturity
probability of entire face value paid = 75%
face value = 1000
probability of entire face value not paid = 25%
percent of face value paid= 60%
discount rate = 15%
years to maturity = 3
Answer:
so sorry ! but i need it
Step-by-step explanation:
Wow! There so much extra stuff on this drawing, naturally it's hard to see
what's going on.
First, do you remember "vertical angles" ? They're the pair of opposite angles
that form where lines cross, and they're equal.
-- It says that angle-1 is 55 degrees.
Angle-1 and angle-7 are vertical angles, so angle-7 is also 55 degrees.
-- It says that angle-4 is 60 degrees.
Angle-4 and angle-6 are vertical angles, so angle-6 is also 60 degrees.
Now you can forget about all that stuff that's outside of the triangle in the middle,
and just look at the triangle. They want you to find angle-10.
See the angles at the top of the triangle ... angle-7 and angle-6 ?
We know what both of those are. Angle-7 is 55 degrees, and angle-6 is 60 degrees.
Do you remember what the 3 angles inside a triangle always add up to ?
They always add up to 180 degrees.
Add angle-7 and angle-6 together . . . 55 + 60 = 115 degrees.
So angle-10 is just the rest of the 180 degrees inside the triangle.
Angle-10 = 180 - (115) = 65 degrees
Answer: it will take them 28 minutes to fill the tank.
Step-by-step explanation:
The first pipe alone can fill the tank in 84 minutes. This means that the rate at which the first pipe fills the tank per minute is 1/84
The second pipe can fill the tank in 42 minutes by itself. This means that the rate at which the second pipe fills the tank per minute is 1/42
If they work together, they would work simultaneously and their individual rates are additive. This means that their combined rate of filling the tank would be
1/84 + 1/42
Assuming it takes t hours for both pipes to fill the tank working together, the working rate per minute would be 1/t. Therefore,
1/84 + 1/42 = 1/t
3/84 = 1/t
t = 84/3
t = 28 minutes