Hello,
xy+xz=100==>x(y+z)=100
x/5*(3y+3z)+10=3/5*(x(y+z))+10=3/5*100+10=70
Answer C
Answer:
50 cents
Step-by-step explanation:
This is the equation I came up with: 150 = 100+<em>p</em>
Subtract 100 from 150 to leave the <em>p</em> alone.
50 = <em>p</em>
Answer:
11,744
Step-by-step explanation:
Answer:
77,000
Step-by-step explanation:
If 72,000 is 150% of direct labor, then direct labor is 48,000 (72000/1.5)
direct labor 48000
overhead. 72000
total. 120,000
total costs: 197,000
less total above: 120,000
=material costs. 77,000
Each coordinate of U'V'W' is 3/4 of that of UVW.
Triangle U'V'W' is a dilation of triangle UVW about the origin with a scale factor of 3/4.
_____
15/20 = -9/-12 = 6/8 = 4.5/6 = -18/-24 = -3/-4 = 3/4