Answer:
Explanation:
We summarize the assets and liabilities in the classified balance sheet into various types Like assets are divided into fixed assets, current assets, and intangible assets.
Liabilities are likewise divided into current liabilities, long-term liabilities The accounting equation is used in any balance sheet which means
Total assets = Total liabilities + shareholder equity
So, the accounts which are appeared on the balance sheet are shown below:
1. Accounts Payable = Current liabilities
2. Accounts Receivable = Current assets
3. Andrew King, Capital = Stockholder equity
4. Cash = Current assets
5. Land = Fixed assets
6. Supplies = Current assets
7. Wages Payable = Current liabilities
All other are related to the income statement. Therefore, ignored it
The agricultural worker that cuts down trees with chain-saws is a lumberjack.
Answer:
E. Purchasing inputs such as raw materials, resources, equipment and supplies
Explanation:
In business, <u>Procurement</u><u> </u>is the process of acquiring goods/services in order to support operational activities.
It includes all the aspects related to a purchase: price ( estimates, biddings ) , payment terms, good specifications, quality, delivery, volumes, etc.
A type of long term permanent financing for residential construction or large construction projects, that replaces the construction loan is called a takeout loan.
<h3>
What is a takeout loan?</h3>
A takeout loan is a method of financing whereby a loan that is procured later is used to replace the initial loan.
More specifically, a takeout loan, or takeout financing, is long-term financing that the lender promises to provide at a particular date or when particular criteria for completion of a project are met.
A take-out loan provides a long-term mortgage or loan on a property that "takes out" an existing loan.
The take-out loan will replace interim financing, such as replacing a construction loan with a fixed-term mortgage.
If the take-out loan is used to finance a rental or income-generating property, the take-out lender may be entitled to a portion of the rents earned.
To learn more about take-out loan, refer
brainly.com/question/1415802
#SPJ4
Answer:
Explanation:
WORK IN PROCESS INVENTORY
May 1 balance 3770 May 31 Finished Goods 9234
31-May Material 11470
31-May labour 13870
31-May Overheads 9431.6
may 31 Balance 29307.6
JOB COST SHEET
Job no. Beg. WIP Material Labour Overheads Total
430 1340 3850 3400 2312 10902
431 0 4680 8170 5555.6 18405.6
TOTAL 1340 8530 11570 7867.6 29307.6
Note: Total cost of Job 429 transferred to Finished goods:
Beginning cost 2430
Add: Material 2940
Add: Labour 2300
Add: Overheads (2300*68%) 1564
Total cost of Job 429 9234