Answer:
1.)(I cant draw a slope but here is the equation) 45x+150
2.) 25(45) + 150
1125+150
1275
the coding project will cost <u>$1275</u> if the programmer charges $45 and hour, and takes up 25 hours
Answer:
its a rectangle
Step-by-step explanation:
how to explain this
Answer:
34
Step-by-step explanation:
The '68-95-99.7' rule says
-About 68% of values fall within one standard deviation of the mean.
-About 95% of the values fall within two standard deviations from the mean.
-Almost all of the values — about 99.7% — fall within three standard deviations from the mean.
Here 
Therefore, the probability

The required probability
