Answer:
B is true
Step-by-step explanation:
ratio of all corresponding sides are equal
Answer: The equation is y = -6*x
Step-by-step explanation:
I suppose that we want to find the equation for a line that passes through the point (-1, 6) and the origin (remember that the origin is the point (0,0))
A general linear equation is written as:
y = a*x + b
Where a is the slope and b is the y-intercept.
If this line passes through the points (x₁, y₁) and (x₂, y₂), then the slope of the line is equal to:
a = (y₂ - y₁)/(x₂ - x₁)
Now we know that our line passes through the points (0, 0) and (-1, 6), then the slope is:
a = (6 - 0)/(-1 - 0) = 6/-1 = -6
Then our equation is something like:
y = -6*x + b
To find the value of b we can use the fact that this line passes through the point (0, 0).
This means that when x = 0, y is also equal to zero.
If we replace these values in the equation we get:
0 = -6*0 + b
0 = b
Then our equation is:
y = -6*x
It would be 190 km because you do 5 x 3 to get 15 add a 0 at the end of it. Than at 40 because .8 of 150 is 40. Then 150+40= 190
Answer:
Critical value is -1.98.
Step-by-step explanation:
Given:
The value of alpha is, 
Now, in order to find the critical value, we need to subtract alpha from 1 and then look at the z-score table to find the respective 'z' value for the above result.
The probability of critical value is given as:

So, from the z-score table, the value of z-score for probability 0.976 is 1.98.
Now, in a left tailed test, we multiply the z value by negative 1 to arrive at the final answer. We do so because the area to the left of mean in a normal distribution curve is negative.
So, the z-score for critical value 0.024 in a left tailed test is -1.98.
Answer:
<em>Most likely time, </em>according to PERT (Program evaluation and review technique).
Step-by-step explanation:
PERT is "a statistical tool used in <em>project management" (Program evaluation and review technique (2020), </em>in Wikipedia), and it is commonly used with CPM <em>(Critical Path Method)</em> to manage projects.
Inside PERT, there are different defined times to accomplished an activity in a project, that is:
- An <em>optimistic time</em> or minimum time required to accomplished an activity, i.e., if everything goes better than normal, the activity is accomplished before expected.
- A <em>pessimistic time, </em>a time quite the opposite to optimistic time.
- A <em>most likely time</em>, or a time required to accomplished an activity if everything goes as expected or normally.
- An <em>expected time</em>, an statistical estimation.
Considering the question, we have that the <em>time</em> when "the first module of the project could be completed":
- "[...] in as few as 15 days" is the <em>optimistic time</em>.
- "[...] or could take as many as 25 days" is the <em>pessimistic time</em>.
- "[...] but most likely will require 20 days" is the <em>most likely time</em>.
As a result, the <em>20-day estimate</em> is called the <em>most likely time</em> in the context of the PERT/CPM techniques.