1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Artemon [7]
3 years ago
12

Use the ruler to find the length of the yarn. This distance around the circle is the ____________________ of the circle.

Mathematics
1 answer:
vova2212 [387]3 years ago
7 0
Circumference is the distance around the circle
You might be interested in
Please help and leave a small explanation if u want brainliest :)
mr Goodwill [35]

Answer:

B is true

Step-by-step explanation:

ratio of all corresponding sides are equal

3 0
3 years ago
Read 2 more answers
A line that passes through (-1, 6) and the origin
zmey [24]

Answer: The equation is y = -6*x

Step-by-step explanation:

I suppose that we want to find the equation for a line that passes through the point (-1, 6) and the origin (remember that the origin is the point (0,0))

A general linear equation is written as:

y = a*x + b

Where a is the slope and b is the y-intercept.

If this line passes through the points (x₁, y₁) and (x₂, y₂), then the slope of the line is equal to:

a = (y₂ - y₁)/(x₂ - x₁)

Now we know that our line passes through the points (0, 0) and (-1, 6), then the slope is:

a = (6 - 0)/(-1 - 0) = 6/-1 = -6

Then our equation is something like:

y = -6*x + b

To find the value of b we can use the fact that this line passes through the point (0, 0).

This means that when x = 0, y is also equal to zero.

If we replace these values in the equation we get:

0 = -6*0 + b

0 = b

Then our equation is:

y = -6*x

7 0
3 years ago
Someone please help me with this. thanks. and please explain.
just olya [345]
It would be 190 km because you do 5 x 3 to get 15 add a 0 at the end of it. Than at 40 because .8 of 150 is 40. Then 150+40= 190
4 0
3 years ago
Read 2 more answers
Using the z table, find the critical value for a=0.024 in a left tailed test
natita [175]

Answer:

Critical value is -1.98.

Step-by-step explanation:

Given:

The value of alpha is, \alpha=0.024

Now, in order to find the critical value, we need to subtract alpha from 1 and then look at the z-score table to find the respective 'z' value for the above result.

The probability of critical value is given as:

P(critical)=1-\alpha=1-0.024=0.976

So, from the z-score table, the value of z-score for probability 0.976 is 1.98.

Now, in a left tailed test, we multiply the z value by negative 1 to arrive at the final answer. We do so because the area to the left of mean in a normal distribution curve is negative.

So, the z-score for critical value 0.024 in a left tailed test is -1.98.

7 0
3 years ago
mauricio estimates that the first module of the project could be completed in as few as 15 days or could take as many as 25 days
4vir4ik [10]

Answer:

<em>Most likely time, </em>according to PERT (Program evaluation and review technique).

Step-by-step explanation:

PERT is "a statistical tool used in <em>project management" (Program evaluation and review technique (2020), </em>in Wikipedia), and it is commonly used with CPM <em>(Critical Path Method)</em> to manage projects.

Inside PERT, there are different defined times to accomplished an activity in a project, that is:

  • An <em>optimistic time</em> or minimum time required to accomplished an activity, i.e., if everything goes better than normal, the activity is accomplished before expected.
  • A <em>pessimistic time, </em>a time quite the opposite to optimistic time.
  • A <em>most likely time</em>, or a time required to accomplished an activity if everything goes as expected or normally.
  • An <em>expected time</em>, an statistical estimation.

Considering the question, we have that the <em>time</em> when "the first module of the project could be completed":

  • "[...] in as few as 15 days"  is the <em>optimistic time</em>.
  • "[...] or could take as many as 25 days" is the <em>pessimistic time</em>.
  • "[...] but most likely will require 20 days" is the <em>most likely time</em>.

As a result, the <em>20-day estimate</em> is called the <em>most likely time</em> in the context of the PERT/CPM techniques.

3 0
3 years ago
Other questions:
  • A moving company charges $40 plus $0.25 per mile to rent a van. Another company charges $25 plus $0.35 per mile to rent the same
    12·1 answer
  • Which of the following equations have no solutions?
    14·2 answers
  • A 20 gallon container is filled with 6 gallons of gasoline. What fraction of the container is filled with gasoline? (reduce)
    8·1 answer
  • Solve for q. √3q + 2 = √5
    6·1 answer
  • 10. Find the distance between A(-2, 1) and B(4, -3). Round your answer to<br> the nearest TENTH
    7·1 answer
  • The area of a rectangle is 36 m centimeters and its length is 9 cm what is the width of the rectangle
    10·2 answers
  • The quantities x and y are oropottional find the contast of proportional of(r) y=rx ​
    15·1 answer
  • (URGENT) Can someone please help me with this? Thank you! :)
    6·1 answer
  • Solve each if the given equalities<br>2x + 5&lt;-3​
    13·1 answer
  • My life is hellpless.... could you please help? i cant even understand this I'm only 11.
    12·2 answers
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!