Using confidence interval concepts, it is found that:
a) The point estimate is the sample mean.
b) The confidence interval is: 
c) If $1411 is between the bounds of the interval yes, otherwise no.
--------------
- At item a, it asks to provide a point estimate for the population mean, which is the sample mean

--------------
Item b:
- In the spreadsheet, it is possible to find the <em>standard deviation for the sample</em>, thus, the t-distribution is used.
- The confidence interval will be given by:

In which:
is the sample mean.- T is the critical value, from the t-distribution, with a two-tailed area of
and n-1 degrees of freedom. - s is the standard deviation for the sample.
- n is the sample size.
--------------
Item c:
We have to check if 1411 is between
and
.
- If it is, the interval includes the National Average, otherwise, it does not.
A similar problem is given at brainly.com/question/24232455
For a relation to be called a function, it must pas the vertical line test and each x-value must have a unique y-value
<span>The graph of this sequence would pass the vertical line test.
</span>Each day corresponds to a unique amount of pennies in this sequence.
Answer:
D. They have the same y-intercep
Step-by-step explanation:
Before the comparison will be efficient, let's determine the equation of the two points and the x intercept .
(–2, –9) and (4, 6)
Gradient= (6--9)/(4--2)
Gradient= (6+9)/(4+2)
Gradient= 15/6
Gradient= 5/2
Choosing (–2, –9)
The equation of the line
(Y+9)= 5/2(x+2)
2(y+9)= 5(x+2)
2y +18 = 5x +10
2y =5x -8
Y= 5/2x -4
Choosing (4, 6)
The equation of line
(Y-6)= 5/2(x-4)
2(y-6) = 5(x-4)
2y -12 = 5x -20
2y = 5x-8
Y= 5/2x -4
From the above solution it's clear that the only thing the both equation have in common to the given equation is -4 which is the y intercept
X^2 - 8x - 6x + 48 i think
Answer:
150 cm2
Step-by-step explanation:
double of triangle abc is 200
this is in middle of both