Given:
A company wants to select 1 project from a set of 4 possible projects.
Consider the options are:
a.
b.
c.
d. 
To find:
The constraints that ensures only 1 will be selected.
Solution:
It is given that the company wants to select 1 project from a set of 4 possible projects. It means the sum of selected projects must be equal to 1.

Therefore, the correct option is (a).
Number......frequency.....relative frequency
10 2 2/24 = 8.3%
20 2 2/24 = 8.3%
30 4 4/24 = 16.7%
40 2 2/24 = 8.3%
50 3 3/24 = 12.5%
60 5 5/24 = 20.8%
70 3 3/24 = 12.5%
80 1 1/24 = 4.2%
90 2 2/24 = 8.3%
total : 24